Feature design draft
H4hHard 09/09(Wed)3 workdays late
Fold in review notes through section 2
2026-09-07 Split the design into three parts — screens, storage, failure paths
Design draft first — it slipped yesterday · replies after lunchas of 09:10
This week (~09/11)
16h over
Need 21h · Have 5h
In progress
1 item(s)
up to 3 at once
quiet for 5+ days
0 item(s)
Start now or the deadline is gone
H4hHard 09/09(Wed)3 workdays late
Fold in review notes through section 2
2026-09-07 Split the design into three parts — screens, storage, failure paths
H4hSoft 09/11(Fri)deferred 2x1 workday late
Time the earlier of the two slow stretches
2026-09-07 Twenty identical runs, only three were slow — something else is in play
H4hHard 09/11(Fri)1 workday late
Start with the two failing tests
2026-09-07 Two went up as they were; the other two changed how they are called
M3hSoft 09/10(Thu)deferred 1x1 workday late
Keep only the three fields that get filled in
M2hSoft 09/10(Thu)1 workday late
Start with the four screens that changed
Nothing in this column
Touch it today to stay inside the deadline
H2hSoft 09/11(Fri)
Draft the answers and get them checked
M2hSoft 09/11(Fri)
Start with the three most common shapes
Nothing in this column
Start it this week
H1hHard 09/11(Fri)Recurring
Collect what happened this week
M3hSoft 09/14(Mon)
Rewrite the two steps that changed
M1hSoft 09/14(Mon)
Start with the words meetings trip over
Nothing in this column
Cannot act on it · the deadline is still live
M1hSoft 09/18(Fri)My turn 09/14(Mon)
Waiting — not my turn
M1hSoft 09/12(Sat)My turn 09/16(Wed)
Waiting — not my turn
⚠️ It comes back on 09/16(Wed), but it had to start by 09/10(Thu) — the deadline is already gone when it returns
H1hSoft 09/22(Tue)My turn 09/17(Thu)
Waiting — not my turn
M2hSoft 09/30(Wed)My turn 09/24(Thu)
Waiting — not my turn
Nothing in this column
Decide it or drop it
Drop the values nothing reads
Work back from last quarter
Start from the expiry date
Nothing in this column
Slips forever unless time is set aside
H
Settle who looks at it first
H
Run last month's copy through once
Nothing in this column
Not time to start yet
Soft 09/18(Fri)
Put down what we actually look at now
Soft 09/22(Tue)
Time each stage
Soft 09/25(Fri)
Count what fired last month
Soft 09/25(Fri)
Write down what did not work last time
Soft 09/30(Wed)
Ask where the first week gets stuck
Soft 10/02(Fri)Touched today
Pick what carries over from last time
2026-09-10 Picked three pieces that carry over as they are
Soft 10/08(Thu)
Drop the ones nobody looks at
Nothing in this column
Not negotiable · taken off the top · shown in the columns with a Recurring badge — hiding today's work would make “nothing starts today” a lie